Seventeen projects, every one measured.
Five case studies with figures and progress photographs, and the full register of work since 2019. Filter by sector, status and city.
Case studies
Residential / Ikoyi, Lagos
Marina Point Residences
A 26-floor apartment tower on a narrow lagoon-edge plot, handed over three weeks ahead of programme.
- Value band
- ₦18 billion to ₦25 billion
- Duration
- 34 months
- Size
- 38,600 sqm
Commercial / Victoria Island, Lagos
The Alder
A 14-floor head office with a unitised curtain wall and two basement levels on a busy Victoria Island street.
- Value band
- ₦12 billion to ₦18 billion
- Duration
- 28 months
- Size
- 21,400 sqm
Roads and drainage / Kubwa, Abuja
Northern Link Road
A 7.4 km dual carriageway with 11 km of lined drains, three box culverts and two pedestrian bridges, built through two rainy seasons.
- Value band
- ₦6 billion to ₦9 billion
- Duration
- 18 months
- Size
- 7.4 km dual carriageway
Fit-out / Central Business District, Abuja
Headquarters fit-out, Central Business District
Six floors of a working headquarters fitted out one floor at a time, with staff moving in behind us.
- Value band
- ₦3 billion to ₦5 billion
- Duration
- 11 months
- Size
- 9,200 sqm
Residential / Wuse 2, Abuja
Halden Court
Seventy apartments over street-level shops, designed and built by Ironwood Build under one lump-sum contract.
- Value band
- ₦9 billion to ₦13 billion
- Duration
- 26 months
- Size
- 17,800 sqm
No case studies match these filters. The register below may still list smaller projects, or .
Project register
Value bands in naira, including VAT
No projects in the register match these filters.