← A Covorn template · Construction company website Make it mine
Ironwood
Build
Request a quote

Health and safety

Demonstration figures, invented for this template

Everyone goes home the way they came.

Lost-time injury frequency rate, 2025, per 200,000 hours
0.08
Hours worked across all sites in 2025
3.4m
Toolbox talks recorded in 2025
11,800
Near misses reported, and every one closed out
2,140

Seven years of falling injury rates.

Lost-time injury frequency rate per 200,000 hours worked, all sites, all subcontractors included. Demonstration figures.

Lower is betterIndustry benchmark not shown

Six golden rules.

Printed on every site board and covered at every induction. Breaking one is the only thing that removes someone from an Ironwood site on the same day.

  • Work at height

    Harnessed and clipped on above two metres, every time, with edge protection in place before slabs are stripped.

  • Lifting operations

    No lift without a lift plan, a trained slinger and a banksman, and nobody under a suspended load.

  • Excavations

    Every excavation deeper than 1.2 metres is supported or battered back and inspected before anyone enters.

  • Plant and people

    Exclusion zones around moving plant, and no one walks behind a reversing machine.

  • Permits to work

    Hot works, confined spaces and live electrical work start only with a signed permit.

  • Fit for work

    No alcohol or drugs on site, and anyone unwell or exhausted is sent home on full pay.

A site operative in an orange vest and hard hat

Anyone can stop the job.

Every person on an Ironwood site, from a labourer on day one to the project director, carries a stop-work card. Raising it halts the activity until the hazard is fixed, and nobody is ever disciplined for using it.

In 2025 stop-work cards were raised 312 times, and the head of safety reviewed every one. Demonstration figure.

Safety lead
Head of Health, Safety and Environment, reporting to the board
Site ratio
One HSE officer for every 60 workers
Incident line
+234 809 000 7700, answered 24 hours
A rack of yellow hard hats in the site stores

Training, welfare and the start of every shift.

Induction
A half-day site induction in English, Yoruba, Hausa or Igbo, with a test at the end. Nobody starts work without passing it, and visitors receive a shorter version.
Daily start-of-shift briefing
Ten minutes at 07.00 with every gang: today's high-risk activities, the weather, any near miss from yesterday and who the first aiders are.
Welfare
Clean drinking water, shaded rest areas, toilets and showers, a canteen and a first aid room on every site. Heat-stress breaks are scheduled from February to April.
Personal protective equipment
Hard hats, boots, gloves, glasses and high-visibility vests issued free to every worker, including subcontractors, and replaced on request.
Subcontractors
Subcontractors are assessed for safety before they are approved, work to our rules and are audited monthly. See the supplier registration page.