← A Covorn template · Construction company website Make it mine
Ironwood
Build
Request a quote

Sustainability

Demonstration figures, invented for this template

Less cement, less diesel, less waste.

We measure what leaves every site in a skip, a truck or an exhaust, and we report it to clients every quarter. These are the four things that make the biggest difference.

Where site waste went, all sites, 2025
  • Recycled64%
  • Reused on site17%
  • Landfill19%
A grey concrete building frame under construction

Concrete

22%average cement replaced with blended binders on frames in 2025

Where the structural engineer approves, our batching plants use blended cements and limestone fines to cut the cement in each cubic metre. Every mix is trialled and cube-tested in our own laboratories before it reaches a slab.

Site power

38%fewer generator hours per site since 2021

Site offices and welfare cabins run on solar panels and batteries. Generators are sized to the load, run on a timer and switched off at night unless a pour or a pump needs them.

Water

70%of washout water recycled at both batching plants

Truck and pump washout water is settled, filtered and reused at the Agbara and Idu plants. Silt traps on every site keep cement slurry out of street drains.

People nearby

61%of site labour hired within 10 km of the site

We recruit and train labour close to each site, pay weekly through bank accounts and offer every long-serving labourer a route to a trade certificate.

An engineering team gathered on a building site

What you can ask for on your project.

  • A quarterly report of waste, water, fuel and concrete carbon for your site
  • Blended-cement mixes trialled and priced at tender
  • Solar site cabins and a generator plan in the preliminaries
  • Local labour targets written into the contract
Request a quote