← A Covorn template · Construction company website Make it mine
Ironwood
Build
Request a quote

Building and civil engineering, Lagos and Abuja, since 2006

Built to the drawing. Handed over on the date.

Residential towers, commercial buildings, roads and fit-out, delivered with our own frame crews, our own plant and a programme you can hold us to.

A residential tower under construction with a tower crane above it

Lekki twin towers, frame at level 9, October 2026

Live on site this month

Progress against programme, November 2026

  • Headquarters fit-out Central Business District, Abuja / Fit-out 68% due Feb 2027
  • Halden Court Wuse 2, Abuja / Design and build 61% due Jul 2027
  • Jabi lakeside offices Jabi, Abuja / Commercial 47% due Oct 2027
  • Agbara estate roads, phase 2 Agbara, Lagos / Roads and drainage 35% due May 2027
  • Lekki twin towers, frame Lekki, Lagos / Residential 22% due Mar 2028
The concrete frame of Marina Point Residences at the lower floors

Frame at level 6, core two floors aheadMarch 2022

Featured project, completed 2024

Marina Point Residences

A 26-floor apartment tower on a narrow lagoon-edge plot, handed over three weeks ahead of programme.

Location
Ikoyi, Lagos
Client
A private residential developer
Value band
₦18 billion to ₦25 billion
Duration
34 months
Floors
Ground plus 25
Gross floor area
38,600 sqm
Read the case study

From tender to handover in eight stages.

Every project runs through the same eight stages, with named deliverables at each one. You always know which stage you are in and what you will receive before the next begins.

How we work
  1. 01Tender and estimate2 to 6 weeks
  2. 02Pre-construction4 to 10 weeks
  3. 03Mobilisation2 to 4 weeks
  4. 04Substructure3 to 8 months
  5. 05Superstructure and envelope8 to 20 months
  6. 06Services and finishes6 to 14 months
  7. 07Testing and commissioning4 to 10 weeks
  8. 08Handover and defects12 months
A site operative in an orange vest and yellow hard hat

Health and safety, demonstration figures

0.08

Lost-time injury frequency rate across every site in 2025.

Per 200,000 hours worked, against 3.4 million hours on site. Every operative has stop-work authority, and our head of safety reports to the board, not to the project.

Our safety record and golden rules
Night lifts, a closed lane and not one complaint from the neighbours we heard about. The trading floor was live a month early.
Head of property, client of The Alder, Victoria Island
A bricklayer standing on a stack of bricks on site

Twenty years, two cities, 1,150 people on site at peak.

Ironwood Build started in 2006 with one site in Surulere and a borrowed concrete mixer. We opened in Abuja in 2013, built our own yards in Agbara and Idu, and now run up to twelve sites at a time.