← A Covorn template · Cement company website Make it mine

Quality and certificates

Every bag has a birthday

Each bag carries a batch code. Enter it here to see the day it was milled and how it performed at 2, 7 and 28 days in our laboratory.

Check a batch

Example codes for this demo: MC-2611-0418, MC-2611-0402, MC-2610-2290, MC-2610-2244.

How we test

From the mill to the crusher

Our laboratory at Moniya runs around the clock.

Every two hours

Fineness, chemistry and setting time from each mill.

Mortar prisms

Standard prisms crushed at 2, 7 and 28 days for every batch.

Outside checks

An independent laboratory tests random bags from the market every month.

Woman engineer in a hard hat checking work on site

Ready-mix quality

Cubes from your own pour

For ready-mix, we take three cubes from every second truck on your site. Results go to your account at 7 and 28 days, and to your consultant if you name one.

  • Slump checked at the gate before discharge
  • Batch tickets show cement, water and admixture weights
  • Any failed cube triggers a core test at our cost

Standards

What we test against

Example references for this demo; a real site lists its actual certifications.

Property42.5R32.5NHow often
2 day strengthat least 20 MPaNot requiredEvery batch
7 day strengthNot requiredat least 16 MPaEvery batch
28 day strength42.5 to 62.5 MPa32.5 to 52.5 MPaEvery batch
Initial setting timeat least 60 minat least 75 minEvery 2 hours
Soundnessat most 10 mmat most 10 mmDaily

Questions

Quality questions

Short answers.

My batch code does not work.

Check the code under the stitching, not the printed date. If it still fails, call the quality desk on +234 800 000 0148. It may be a fake bag.

Can I bring my own cubes?

Yes. The laboratory tests customer cubes for ₦6,500 a set of three, example rate.

Who do I call about a failed slab?

The quality desk sends an engineer within 48 hours, free of charge, to investigate.

Questions about a pour?

Our quality desk is open around the clock.