Infrastructure
Power, water, rail and road, run by the zone
The services that decide whether a factory runs: stated in your lease, measured every day and reported to you each quarter.
Utilities
What runs under the roads
Solar farm
12 MW of panels and 20 MWh of batteries along the southern edge. Phase two adds 8 MW in 2027.
Grid and gas
A dedicated 33 kV feeder and a 10 MW gas plant on standby take over in seconds.
Water
Two boreholes and a treatment works deliver 4,000 m³ a day at 24 hour pressure.
Fibre
Two carriers in shared ducts, with a meet-me room at the one-stop centre.
Fire and security
A fire station inside the gate, CCTV on the fence line and patrols day and night.
Roads
Tradewind Avenue and service roads built for 40 tonne axle loads.
Service levels
What we promise, and what happens if we miss
Measured monthly and reported in your investor portal. Example figures for this demo.
| Service | Promise | Last 12 months | If we miss |
|---|---|---|---|
| Power availability | 98.5 percent | 99.2 percent | Service charge credit of 5 percent per point |
| Water pressure | 3 bar, 24 hours | Met 362 of 365 days | Credit on the next invoice |
| Customs release | Same day for complete files | 94 percent same day | Escalation to the depot manager |
| Fault response | Engineer on site in 30 minutes | Average 18 minutes | Report to the board |
Night shifts
Batteries that carry a third shift
Solar charges the batteries by day and the batteries carry Zone B factories through the evening peak. The gas plant covers the rest of the night. You see your blended tariff on each monthly bill.
Getting here
Road, rail and air
Northern bypass
The main gate is on the bypass at kilometre 18, with a slip road for trucks and a separate staff entrance.
Rail siding
Block trains to the coast twice a week, loaded inside the zone at the container depot.
Airport
About 35 minutes by car to the international airport. We collect visiting investors on request.
Staff buses
Zone buses run from four points in the city for each shift, timed to avoid the worst traffic.
Zone office
Km 18, Northern Bypass
Km 18, Northern Bypass, Kano (example address). Main gate open day and night for tenants. Visitor reception Monday to Saturday, 8am to 5pm.
Map placeholder and example address for this demo.

Next step
Ask the zone engineer
Bring your load profile to a site visit and we will size your connection with you.