Pipeline construction and integrity

From right-of-way clearing in the swamp to the last hydrotest chart, we build and look after the lines that carry the Delta's oil and gas.

Service code
PL
Of line laid since 2009
412 km
Weld repair rate, 2025
0.8%
HDD crossings completed
31

Scope

We run conventional land spreads, swamp push-pull crews and tie-in teams. Integrity work runs alongside, so the people who build a line also know how it fails.

  • Flowline and trunk line construction, 4 in to 36 in
  • Swamp lay by push-pull and floatation methods
  • Horizontal directional drilling crossings under creeks and roads
  • Hot tapping, stoppling and live line tie-ins
  • Integrity programmes: cathodic protection, clamp repair and sleeve installation
  • Hydrotesting, dewatering, drying and nitrogen purging
A blue pipe section resting on excavated earth

A blue pipe section resting on excavated earth. Deltaline pipeline construction and integrity, illustrative photograph.

Capabilities

What we bring to site, in plain terms. Specifications and certificates for any item are shared with operators at tender stage.

Welding

Forty-two qualified welders across manual, semi-automatic and automatic processes, with procedures qualified per client specification.

Swamp spreads

Two complete swamp spreads with marsh excavators, pontoons and pull winches for mangrove and tidal routes.

Crossings

A 120-tonne HDD rig and a drilling fluid recycling plant for crossings up to 900 metres.

Integrity

Composite and steel sleeve repair, clamp installation and in-house cathodic protection survey teams.

Key equipment

Owned by Deltaline and maintained at Onne. The full register is on the fleet and equipment page.

Fleet and equipment
ItemSpecificationQty
Sideboom, 70 tPipe lifting and lowering-in8
Marsh excavator, amphibiousPontoon tracks, 21 t6
HDD rig120 t pullback1
Hot tap machineUp to 24 in, 1,440 psi2
Automatic welding systemDual torch, internal clamp4
Fill and test pump2,500 litres per minute3

How a typical project runs

Durations are typical for a mid-sized scope. Every programme is agreed with the operator before mobilisation.

  1. Route survey

    2 to 4 weeks

    Right-of-way walk with the operator and community liaison officers, ground survey and crossing studies.

  2. Engineering

    4 to 8 weeks

    Weld procedures, lay method, crossing design and a hydrotest plan, all submitted for operator approval.

  3. Mobilisation and clearing

    3 weeks

    Spread mobilised from Onne, right-of-way cleared, access matting placed in soft ground.

  4. Lay, weld and coat

    By kilometre

    String, weld, inspect, coat and lower in. Each joint is logged against its radiograph and coating test.

  5. Test and hand over

    3 to 5 weeks

    Hydrotest, dewater and dry, then the as-built survey and turnover dossier.

Work in this discipline

DL-PL-2187 / Case study Replacing 18 km of 24 in gas line through Eleme and Okrika 18 km of 24 in line laid3 HDD creek crossings36 h total shutdown for tie-in Read the case study
From the project register
RefYearScopeResult
DL-PL-22692026Clamp and sleeve repairs on a 12 in crude line14 repairs, no shutdown
DL-PL-222920246 km swamp flowline by push-pullLaid in 41 days
DL-PL-21522022HDD crossing of a 640 m estuarySingle pass pullback