← A Covorn template · Oil and gas services website Make it mine
DeltalineEnergy Services 24 h +234 84 460 1999
An industrial plant with many lights at night

An indigenous company, built job by job.

Deltaline started in 2009 with eleven people and two slickline units. Seventeen years later we run five service lines from Port Harcourt and Onne, and every one of our managers is Nigerian.

Founded
2009
People
1,140
Service lines
5
Bases
2

Why Deltaline exists

Our founder spent fourteen years as a well services engineer watching contractors fly in specialists for work that Nigerian crews were already doing on the next well.

He started Deltaline to prove that a Port Harcourt company could run that work to the same standard, with people from the communities the wells sit in. The first contract was small: wellhead maintenance on land wells in Rivers State. The operator renewed it four times.

Each new service line has grown out of a problem a client asked us to solve. Pipeline construction came from a flowline that kept failing. The fleet came from a crew boat that kept arriving late. The yard came from equipment we could not get serviced quickly enough. Inspection came from wanting to know our own welds were right before anyone else checked them.

We are privately owned, with no outside shareholders. That lets us invest in training, the yard and the fleet on a long view.

Seventeen years, in order

  1. 2009

    Founded in Port Harcourt

    Eleven people, two slickline units and a rented office on Trans-Amadi. The first contract was a wellhead maintenance programme on land wells in Rivers State.

  2. 2011

    First pipeline spread

    A 9 km flowline in Ogoni, built with a crew hired and trained in the communities along the route.

  3. 2013

    Onne yard opens

    We leased the first two hectares at Onne and built Hall 1 to service our own equipment.

  4. 2014

    Fleet begins

    DL Ikenna, our first platform supply vessel, joined the fleet with an all-Nigerian crew.

  5. 2017

    Inspection becomes a service line

    Our in-house NDT team started working directly for operators.

  6. 2020

    Hall 2 and the training centre

    The yard grew to 4.2 hectares, with a second hall and a training centre inside the fence.

  7. 2026

    400 tonne quay

    The rebuilt quay lets modules roll from the hall straight onto a barge.

How we work

Four habits we hire for, train for and hold each other to.

Say what the data says

We tell operators what we found, including when it is not what they hoped to hear.

Finish the paperwork

A job is not done until the dossier is. Our turnover packages are on time because we write them as we go.

Train the next crew

Every supervisor is measured on the people they develop, not only on the work they deliver.

Keep our word to communities

If we promise a road, a borehole or a job, it happens, and the community can see it in our monthly report.

A gas processing building with pipework

Port Harcourt

Head office, engineering, commercial and HSE. 14 Trans-Amadi Industrial Layout, Port Harcourt, Rivers State.

An offshore platform standing in calm blue water

Onne

Fabrication yard, marine base, plant store and training centre. Plot 7, Federal Ocean Terminal Road, Onne, Eleme, Rivers State.

The leadership team

6 directors and heads of function, with more than 140 years in the Delta between them.

Meet the leadership