Projects Homes, Ikoyi, Lagos
A duplex in Ikoyi that retired its 20 kVA generator
A family of six, two home offices and four air conditioners. The generator ran eleven hours a day. Now it runs for its monthly exercise and little else.
- Client
- Private residence
- Location
- Ikoyi, Lagos
- Switched on
- 2025
- Inverters
- 2 x 8 kVA in parallel
- Generator hours a day
- 11 before, 0.4 after
- Payback
- 3.9 years
- CO₂ avoided a year
- 21 tonnes
- Figures
- Demo data
The brief
The family wanted the generator off the compound without giving up air conditioning at night. Grid supply on their feeder averaged nine hours a day and arrived at unpredictable times.
What we built
- Split the roof into two arrays, east and west, so generation starts early and runs late into the afternoon.
- Two 8 kVA inverters in parallel so a single fault never leaves the house dark.
- 30 kWh of LFP storage, enough to carry four bedrooms of air conditioning until sunrise.
- Grid kept as a charging source on cloudy days, with the generator wired as a last resort.
Share of the site's energy from sunlight, by month.
Average 63 percent across the months the site was open. The dip from June to August is the heart of the rainy season, when the grid and generator do more of the work.
₦14,160,000
saved in the first year, fuel and servicing
- January: 62 percent62
- February: 58 percent58
- March: 71 percent71
- April: 74 percent74
- May: 69 percent69
- June: 55 percent55
- July: 48 percent48
- August: 51 percent51
- September: 60 percent60
- October: 66 percent66
- November: 72 percent72
- December: 75 percent75
The first week, the children kept asking who switched the generator off. Nobody did. It just never came on.
Want figures like these on your own roof?
Start with a free survey. We will show you comparable projects in your area and what they saved.
Or call +234 809 555 0142