Sunvault

Survey to switch-on in fourteen days.

Six steps, one team, and a named coordinator who answers the phone at every one of them. Here is what happens and how long each part takes for a typical home.

Days from first call. Bars show when each step happens.
  1. 1

    Day 1, same day

    Call or calculator

    Tell us what you run and how much you spend on fuel. We send a first estimate the same day.

  2. 2

    Day 2 to 4, 90 minutes on site

    Site survey

    A surveyor visits, measures the roof, checks the wiring and logs your loads. About 90 minutes, no charge in our three cities.

    A surveyor in a yellow hard hat on site
  3. 3

    Day 5, within 48 hours of survey

    Design and fixed quote

    An engineer designs the system and we send a fixed quote with every component named, a shading report and a payback estimate.

  4. 4

    Day 6 to 9, your pace

    Deposit and scheduling

    Pay outright or start a pay monthly plan. We book your installation date and order components from our warehouse.

  5. 5

    Day 10 to 12, 1 to 2 days

    Installation

    A crew of four mounts panels, fits the inverter and batteries, and rewires your distribution board. Most homes take one to two days.

    An installer fixing a black solar panel into its rail
  6. 6

    Day 12 to 14, 2 hours

    Switch-on and handover

    We test every circuit, connect the app on your phone and walk you through it. Your generator can rest from tonight.

    The display of a newly commissioned inverter

What arrives on installation day.

Every component is named in your quote with its warranty. Nothing is swapped on the day without your written agreement.

  • Panels and mounting

    550 W monocrystalline panels on aluminium rails, clamped to roof seams or fixed through sealed brackets.

  • Hybrid inverter

    Takes power from roof, battery, grid and generator and decides, every second, which to use.

  • Battery modules

    Lithium iron phosphate, wall or rack mounted, with their own management system and fire-rated enclosure.

  • Protection and changeover

    DC isolators, surge protection, earthing and an automatic changeover into your existing board.

  • Monitoring gateway

    A small unit that sends readings to the Sunvault app every 30 seconds over Wi-Fi or its own SIM.

  • Paperwork

    A single line diagram, test results, warranty certificates and a laminated card on how to switch it off safely.

Three things to sort before we arrive.

  1. Clear access to the roof and the board.We need a ladder line to the roof and a clear metre in front of your distribution board and battery wall.
  2. A morning without the generator.Power is off for about four hours while we rewire the board. Most families plan a trip out.
  3. Your Wi-Fi password, or a good signal.The monitoring gateway connects to your router. If you do not have one, it uses its own SIM at no cost to you.

Step one takes about five minutes.

Book the survey online and choose a morning that suits you. We confirm by phone within one working day.

Or call +234 809 555 0142