Buy outright
For businesses with capital to deploy
- Deposit
- 50% on order, 50% on switch-on
- Term
- Not applicable
- You own it
- From switch-on
- Saving
- Largest over 10 years
We design commercial systems from 10 kWp to 500 kWp around the way your site actually uses power, then finance them so the saving starts before the first payment.
A 60 kVA generator at three-quarter load burns about 13 litres an hour. Since you opened this page it has cost
₦0
Illustration based on typical consumption. Your audit measures your own.
Typical system sizes and diesel reductions from our commercial installations. Your audit gives your own figure.
| Sector | Typical system | Diesel cut | What we do differently |
|---|---|---|---|
| Offices | 20 to 80 kWp | 70 to 90% | Working hours sit inside the sunny hours. Most offices barely need the generator after switch-on. |
| Factories and workshops | 60 to 500 kWp | 40 to 65% | We move heavy loads into the middle of the day and keep generators for the night shift. |
| Cold stores | 50 to 200 kWp | 50 to 70% | Pre-cool hard while the sun is high, then coast through the evening on storage. |
| Hotels and short lets | 30 to 150 kWp | 45 to 70% | Rooms stay cool at night, guests stop hearing generators, and reviews stop mentioning them. |
| Fuel stations | 15 to 40 kWp | 60 to 85% | Pumps, canopy lights and the shop on sunlight. A strange kind of irony, and good business. |
| Farms and agro-processing | 10 to 120 kWp | 55 to 80% | Borehole pumps, hatcheries and milling scheduled into daylight, with storage for incubators. |
For every site above 20 kWp, we clip a data logger onto your main incomer and generator for a week. It records every minute of demand, including the spikes when compressors and lifts start.
Kilowatts across 24 hours. The gold shape is what an 86 kWp array would produce on the same day. The overlap is the diesel you stop buying.
For businesses with capital to deploy
For steady businesses that want the asset
For sites above 30 kWp that want no capital outlay
Lease and power purchase agreements are subject to a credit review of the last 12 months of accounts.
Storage is the most expensive part of a commercial system. We size it to cover the hours where diesel costs you most and let a smaller, well-loaded generator handle the small hours. The result is a shorter payback than an all-battery design.
The seven day audit is free for sites in Lagos, Abuja and Port Harcourt that spend more than ₦1,500,000 a month on diesel.
Or call +234 809 555 0142