← A Covorn template · Solar energy company website Make it mine
Sunvault

Projects Clinics, Maitama, Abuja

A Maitama clinic where the vaccine fridge never loses a degree

Twelve beds, a small theatre, a laboratory and a vaccine cold chain. A five second outage used to mean a restart and a lost sample run.

Blue solar panels in neat rows under clear sky
Client
Cedarline Family Clinic
Location
Maitama, Abuja
Switched on
2024
Inverters
3 x 10 kVA, three phase
Generator hours a day
14 before, 1.1 after
Payback
4.2 years
CO₂ avoided a year
34 tonnes
Figures
Demo data

The brief

The clinic needed clean, uninterrupted power for its laboratory analysers and cold chain, and a way to prove temperature compliance to inspectors.

What we built

  • A protected critical circuit for the theatre, laboratory and vaccine fridge, switched in under 10 milliseconds.
  • Three phase inverters balanced across the clinic's existing distribution board.
  • Temperature sensors on every cold chain fridge, logged in the Sunvault app.
  • Quarterly maintenance with thermal imaging of every connection.

Share of the site's energy from sunlight, by month.

Average 84 percent across the months the site was open. The dip from June to August is the heart of the rainy season, when the grid and generator do more of the work.

₦23,280,000

saved in the first year, fuel and servicing

  • January: 88 percent
  • February: 84 percent
  • March: 90 percent
  • April: 92 percent
  • May: 86 percent
  • June: 74 percent
  • July: 69 percent
  • August: 70 percent
  • September: 79 percent
  • October: 87 percent
  • November: 91 percent
  • December: 93 percent

Our laboratory used to plan its day around the generator. Now it plans around patients.

Dr Ibrahim K., medical director

Want figures like these on your own roof?

Start with a free survey. We will show you comparable projects in your area and what they saved.

Or call +234 809 555 0142