← A Covorn template · Architecture and interior design studio website Make it mine
Mara KinArchitects

A small studio with a long view of the weather.

Eighteen architects, interior designers and technicians: the studio in Ikoyi and a project office in Osu, Accra, working on eight to ten projects at a time across Nigeria and Ghana.

We keep the studio small on purpose. A director is in every client meeting, and the architect who draws your house is the one who visits the site.

Architects reviewing a building model
StudioA model review in the Lagos studio. We build a model of every project at 1:50 before technical drawings begin.

What we mean by tropical modernism

In the 1950s and 1960s, architects across West Africa worked out how modern buildings could live with heat and heavy rain. Their universities, ministries and houses used deep roofs, open plans, screen walls, verandahs and courts, and many of them are still among the most comfortable buildings in Lagos, Ibadan and Accra.

Then air conditioning became cheap and glass became fashionable, and a lot of that knowledge was set aside. We think it was set aside too early. Generators are expensive, power is unreliable and summers are getting hotter.

Our work keeps those climatic answers and updates them for how people live now: smaller plots, tighter budgets, security, home offices and families who want to be outside without being on show to the street.

Six principles

In the order we apply them when a new project arrives on the drawing table. Every brief is tested against all six before we draw a plan.

  1. 1.8 m overhang

    1

    Shade before glass

    We draw the shadow before the building. Roofs project far enough that no direct sun reaches south-facing glass after nine in the morning; east and west faces get screens, fins or planting instead of tinted glass.

  2. 2

    Air must move

    Rooms are one room deep where we can manage it, with openings on two sides and ceilings high enough for warm air to rise and leave. A room that breathes is comfortable for most of the year without a machine.

  3. 3

    The screen as a wall

    Perforated walls of cast concrete, timber or clay give privacy, filter light and let breeze through. We design each pattern for the angle of the sun on that wall and cast the blocks on site.

  4. 900 mm

    4

    Keep the rain at a distance

    Floors sit above the splash line, roofs overhang far enough to throw driving rain clear of doors, and every drawing shows where water goes when a gutter overflows in a July storm.

  5. 2.4 m verandah

    5

    The in-between room

    Verandahs, galleries and shaded courts are not leftover space. They are the rooms where most of a day in Lagos or Accra is actually lived, and we size them as carefully as a living room.

  6. soil from the foundations

    6

    Close at hand

    Laterite, lime, local hardwoods, clay tile and stone from the site. Materials made within a day's drive are cheaper to replace, easier to repair and kinder to the people who build with them.

Fifteen years in six moments

Architectural model of a house
Our first model, for the Surulere house in 2011, still sits on the Lagos studio shelf.
  1. 2011

    Mara Kin-Ogunleye opens the studio in a two-room office on Awolowo Road, Ikoyi, with one assistant and a commission for a family house in Surulere.

  2. 2014

    First commercial building: a small clinic in Yaba designed to run with natural ventilation in its waiting rooms.

  3. 2016

    The practice becomes Mara Kin Architects, with Ifeanyi Obi as a director, and takes its first project outside Lagos, a house in Abuja.

  4. 2019

    Hauwa Sule joins to lead interiors, and the studio begins designing most of the furniture in its projects.

  5. 2021

    Efua Mensah opens the Accra project office in Osu. Restoration becomes a service in its own right a year later, when Kojo Ansah joins.

  6. 2025

    Ilashe Shore Lodge and Cantonments Garden Rooms open within a month of each other. The studio is now eighteen people in two offices.

Eight people lead our projects

One of them will be in every meeting you have with us. Everyone else in the studio is named in the credits of the projects they worked on.

  1. Mara Kin-Ogunleye
  2. Ifeanyi Obi
  3. Efua Mensah
  4. Hauwa Sule
  5. Kojo Ansah
  6. Kelechi Nwankwo
  7. Adaeze Okoro
  8. Tobi Adewale
Portrait of Mara Kin-Ogunleye

01Lagos, since 2011

Mara Kin-Ogunleye

Founding director, architect

Mara founded the studio in 2011 after nine years in practices in Lagos and Accra, where she worked on schools and clinics designed to run without mechanical cooling. She leads the studio's design work and still draws the first plan of every house by hand.

She teaches a design studio one term a year and is writing a short book on verandahs.

Projects: Yaba Printworks, Screen House

Asks every client where they sit at four in the afternoon.

Portrait of Ifeanyi Obi

02Lagos, since 2014

Ifeanyi Obi

Director, projects

Ifeanyi trained as an architect and a quantity surveyor, which is why our fee proposals and cost plans are written in the same plain language as our drawings. He leads the studio's larger buildings and its work outside Lagos.

He is the person clients call when a contractor's programme slips, and he usually already knows.

Projects: Old GRA House, Katampe Ridge House

Keeps a spreadsheet of every rainy season delay since 2014.

Portrait of Efua Mensah

03Accra, since 2019

Efua Mensah

Associate director, Accra

Efua opened the Accra project office in 2021 after two years in the Lagos studio. She grew up in Osu, trained in Kumasi and London, and leads every project the studio takes on in Ghana, from first site visit to handover.

She has a particular interest in the 1950s and 1960s buildings of Accra and leads the studio's walks through them each December.

Projects: Labone Studio Building, Cantonments Garden Rooms

Can tell you which Accra street catches the breeze first.

Portrait of Hauwa Sule

04Lagos, since 2019

Hauwa Sule

Associate, interiors lead

Hauwa leads interiors across the studio. She came to architecture from textile design and has built a network of weavers, joiners and upholsterers across Kano, Ilorin, Lagos and Kumasi who make most of the furniture we specify.

Her rule is that every room should have one thing in it made within a day's drive.

Projects: Osborne Road Apartment, Cantonments Garden Rooms, Ilashe Shore Lodge

Carries fabric samples in every bag she owns.

Portrait of Kojo Ansah

05Accra, since 2022

Kojo Ansah

Restoration architect

Kojo leads the studio's restoration work. He spent eight years surveying and repairing buildings from the 1920s to the 1970s in Ghana and Nigeria before joining us, and he writes the condition reports that decide what we keep.

He believes most old buildings fail at the top and the bottom first, and checks roofs and foundations before he looks at anything else.

Projects: Old GRA House, Yaba Printworks

Owns a moisture meter older than most of the studio.

Portrait of Kelechi Nwankwo

06Lagos, since 2016

Kelechi Nwankwo

Senior project architect

Kelechi runs technical design: the drawings contractors build from. He is particular about roof edges, gutters and the junctions where rain finds its way in, and he visits site more often than his contracts require.

Projects: Katampe Ridge House, Labone Studio Building

Has drawn more gutter details than anyone he knows, by his own count.

Portrait of Adaeze Okoro

07Lagos, since 2018

Adaeze Okoro

Project architect

Adaeze has led three of the studio's most demanding projects, including the lodge at Ilashe, where every beam crossed the lagoon by boat. She manages approvals with the Lagos planning authorities and knows the queue at every desk.

Projects: Screen House, Ilashe Shore Lodge, Yaba Printworks

Learned to pilot a boat to keep the Ilashe programme on time.

Portrait of Tobi Adewale

08Lagos, since 2017

Tobi Adewale

Head of delivery

Tobi manages contracts, tenders and the money side of every project once drawings are done. He compares contractors' prices line by line and writes the monthly cost report every client receives during construction.

Reads every bill of quantities twice.