Our process: eighteen months, drawn on one page.

A typical family house of 640 square metres, starting in January. The red band is the rainy season, which every programme we write plans around.

0 Brief and site study
Brief and site study: month 1 for about 1 months
1 Concept design
Concept design: month 2 for about 2 months
2 Developed design and permit
Developed design and permit: month 3 for about 3.5 months
3 Technical design
Technical design: month 5.5 for about 2.5 months
4 Tender
Tender: month 8 for about 1 months
5 Construction
Construction: month 9 for about 9 months
6 Handover and first rainy season
Handover and first rainy season: month 18 for about 1 months
Months run from January of the first year to June of the second. Construction starts in September, after the heaviest rain, so foundations go in during the dry season.

What we do, and what we ask of you, at each stage

  1. 0  Brief and site study We: Visit the site with you, measure it and photograph it. Ask a great many questions. You: Tell us how you live: who wakes first, where you read, who visits and for how long. Meetings: Two meetings, one on site
  2. 1  Concept design We: Draw two or three different arrangements and build a working model. You: Live with the options for a week. Bring the family to the studio to see the model. Meetings: One presentation, one follow-up
  3. 2  Developed design and permit We: Develop the chosen scheme with the engineers and prepare the permit application. You: Sign off the plan and the cost plan. Provide title documents for the permit. Meetings: Fortnightly design meetings
  4. 3  Technical design We: Draw everything the contractor needs, including the details nobody sees. You: Choose finishes, fittings and colours from samples we prepare. Meetings: Two sample sessions
  5. 4  Tender We: Invite contractors, compare prices line by line and interview the best two. You: Meet the contractors we recommend and agree the contract. Meetings: One interview day
  6. 5  Construction We: Visit site every week or two, answer queries and write a monthly cost report. You: Visit site with us once a month. Make decisions within the week they are asked for. Meetings: Monthly site meeting
  7. 6  Handover and first rainy season We: Inspect the finished building, list defects and return after the first rains. You: Move in, and tell us everything that does not work as it should. Meetings: Handover and a visit twelve months later

How fees work

We charge a percentage of what the building costs to build, agreed in writing before any design begins. The bands below are the ranges we work within; a single figure follows the first site visit.

  • New buildings

    6 to 12per cent

    Of the construction cost. The percentage falls as a building grows, because some of the work does not grow with it. Small, intricate houses sit near the top of the band; larger, simpler buildings near the bottom.

  • Restoration and existing buildings

    9 to 14per cent

    Of the construction cost. Higher than new work because old buildings need measured surveys, opening-up, a condition report and closer supervision on site, where surprises are normal.

  • Interiors

    12 to 18per cent

    Of the fit-out and furnishing budget. Covers layouts, lighting, joinery, furniture design and installation. Interiors alongside our own architecture sit at the lower end.

  • Masterplanning

    Fixedper phase

    A fixed fee for each phase, set by the size of the site, the number of building types and how many approvals are needed. We quote it after a site visit.

How the fee is divided between stages

You pay at the end of each stage, never in advance of the work. The share of the fee for each stage moves within a band, depending on how much of that stage a project needs. Select a stage to read what it covers.

Stage 3  /  8 to 12 weeks

Technical design 25 to 30 per cent of the fee

The drawings and specifications a contractor builds from: every wall, junction, gutter, door and light fitting.

Fees exclude VAT, engineers' fees (which we coordinate and you pay directly) and travel outside Lagos and Accra, charged at cost. You can pause between stages without penalty.

Rendering of a modern house with a pool
Stage 1A stage one view, drawn to test the depth of a verandah against the four o'clock sun.
Architects gathered around a building model
Stage 1Working models are made of card in the studio within days, not weeks, and the whole team reviews them.

Questions clients ask in the first meeting

Start a project
How long does a house take, start to finish?
For a house of 400 to 800 square metres, usually eighteen to twenty-four months: around eight months of design and permits, then ten to fourteen months on site. Restorations are often faster to build but slower to design, because we have to understand what is already there.
Do you work outside Lagos?
Yes. About half of our work is elsewhere: Abuja, Port Harcourt and other Nigerian cities from the Lagos studio, and Ghana from our project office in Osu, Accra. Travel is charged at cost, and we work with trusted local contractors and engineers.
Can we pay fees in cedis?
Yes. For projects in Ghana our fee proposal and invoices are written in cedis by the Accra office. The percentage bands are the same in both countries.
Can we use our own contractor?
Yes. We still recommend pricing the work with two other contractors so you can compare. We will review your contractor's price and programme in the same way we review anyone's.
What if the cost plan comes in over budget?
We tell you at the end of stage two, before technical design, and propose savings with their effect on the building. We do not draw technical details for a building you cannot afford.
Who owns the drawings?
You have a licence to use them to build your project on your site. We keep the copyright, which is normal practice, and we will never reuse your house design for someone else.
Do you design furniture and gardens too?
We design most of the furniture in our interiors and work with landscape designers we trust on gardens and courts. Both can be added to any architecture commission.