Our process: eighteen months, drawn on one page.
A typical family house of 640 square metres, starting in January. The red band is the rainy season, which every programme we write plans around.
What we do, and what we ask of you, at each stage
- 0 Brief and site study We: Visit the site with you, measure it and photograph it. Ask a great many questions. You: Tell us how you live: who wakes first, where you read, who visits and for how long. Meetings: Two meetings, one on site
- 1 Concept design We: Draw two or three different arrangements and build a working model. You: Live with the options for a week. Bring the family to the studio to see the model. Meetings: One presentation, one follow-up
- 2 Developed design and permit We: Develop the chosen scheme with the engineers and prepare the permit application. You: Sign off the plan and the cost plan. Provide title documents for the permit. Meetings: Fortnightly design meetings
- 3 Technical design We: Draw everything the contractor needs, including the details nobody sees. You: Choose finishes, fittings and colours from samples we prepare. Meetings: Two sample sessions
- 4 Tender We: Invite contractors, compare prices line by line and interview the best two. You: Meet the contractors we recommend and agree the contract. Meetings: One interview day
- 5 Construction We: Visit site every week or two, answer queries and write a monthly cost report. You: Visit site with us once a month. Make decisions within the week they are asked for. Meetings: Monthly site meeting
- 6 Handover and first rainy season We: Inspect the finished building, list defects and return after the first rains. You: Move in, and tell us everything that does not work as it should. Meetings: Handover and a visit twelve months later
How fees work
We charge a percentage of what the building costs to build, agreed in writing before any design begins. The bands below are the ranges we work within; a single figure follows the first site visit.
-
New buildings
6 to 12per cent
Of the construction cost. The percentage falls as a building grows, because some of the work does not grow with it. Small, intricate houses sit near the top of the band; larger, simpler buildings near the bottom.
-
Restoration and existing buildings
9 to 14per cent
Of the construction cost. Higher than new work because old buildings need measured surveys, opening-up, a condition report and closer supervision on site, where surprises are normal.
-
Interiors
12 to 18per cent
Of the fit-out and furnishing budget. Covers layouts, lighting, joinery, furniture design and installation. Interiors alongside our own architecture sit at the lower end.
-
Masterplanning
Fixedper phase
A fixed fee for each phase, set by the size of the site, the number of building types and how many approvals are needed. We quote it after a site visit.
How the fee is divided between stages
You pay at the end of each stage, never in advance of the work. The share of the fee for each stage moves within a band, depending on how much of that stage a project needs. Select a stage to read what it covers.
Stage 0 / 2 to 4 weeks
Brief and site study 3 to 5 per cent of the fee
We visit the site, measure it, study the sun and wind, and write the brief with you. You receive a written brief, a site study and a first cost range.
Stage 1 / 4 to 6 weeks
Concept design 12 to 15 per cent of the fee
Two or three ways of arranging the building, drawn as plans, sections and a working model. We choose one together.
Stage 2 / 6 to 10 weeks
Developed design and permit 15 to 20 per cent of the fee
The chosen scheme drawn fully with the engineers, a cost plan from our quantity surveyor and the planning permit application.
Stage 3 / 8 to 12 weeks
Technical design 25 to 30 per cent of the fee
The drawings and specifications a contractor builds from: every wall, junction, gutter, door and light fitting.
Stage 4 / 4 to 6 weeks
Tender 3 to 5 per cent of the fee
We invite three to five contractors to price the work, compare their prices line by line and recommend one.
Stage 5 / Length of the build
Construction 20 to 25 per cent of the fee
Site visits every week or two, monthly cost reports, answers to the contractor's questions and checks on the quality of the work.
Stage 6 / 12 months
Handover and first rainy season 3 to 5 per cent of the fee
We inspect at handover and again after the first rains, and make sure the contractor fixes anything that has failed.
Fees exclude VAT, engineers' fees (which we coordinate and you pay directly) and travel outside Lagos and Accra, charged at cost. You can pause between stages without penalty.