← A Covorn template · Architecture and interior design studio website Make it mine
Mara KinArchitects

Four services, each with its own way of working

The steps differ because the work differs. A new house starts with the site; a restoration starts with what is already standing.

  1. 01Architecture5 steps
  2. 02Interiors5 steps
  3. 03Restoration5 steps
  4. 04Masterplanning5 steps
Concrete and timber house
Plate 1Screen House, Ikoyi. Full architectural service, 2022 to 2024.

01Architecture

New buildings from the first site visit to the end of the first rainy season: private homes, small offices and studios, clinics and lodges, usually between 300 and 3,000 square metres, in Nigeria and Ghana.

Typical projects

  • Family houses in Lagos, Abuja, Port Harcourt and Accra
  • Studios, offices and small mixed-use buildings
  • Lodges, guest houses and retreats

What you receive

  • Plans, sections, elevations and a 1:50 model
  • Planning permit application
  • Technical drawings and specifications
  • Tender, contractor selection and site inspection

See it in practice: Screen House, Ikoyi, Lagos

How architecture runs

  1. 1 Read the site Sun, wind, water and ground, measured and drawn before any plan. 2 to 4 weeks
  2. 2 Three arrangements Two or three ways to place the building, each with a card model. 4 to 6 weeks
  3. 3 Permit drawings The chosen scheme developed with engineers and a cost plan. 6 to 10 weeks
  4. 4 Build drawings and tender Every junction drawn, three to five contractors priced. 12 to 18 weeks
  5. 5 On site, then the rains Visits every fortnight, and an inspection after the first wet season. The build plus a year
Living room with an armchair and low furniture
Plate 2An Ikoyi apartment living room with joinery made in Ebute Metta.

02Interiors

Rooms designed down to the door handle, with our architecture or for existing homes, apartments, guest houses and restaurants. We design most furniture ourselves and have it made by workshops in Lagos, Kano, Ilorin and Kumasi.

Typical projects

  • Apartment and house interiors
  • Guest houses, lodges and small hotels
  • Restaurants, members' rooms and offices

What you receive

  • Layouts, lighting and joinery drawings
  • Finishes, fabrics and a samples board
  • Furniture designs, makers and costs
  • Installation and styling on site

See it in practice: Osborne Road Apartment, Ikoyi, Lagos

How interiors runs

  1. 1 Walk and inventory We list what you own and love, and what the rooms already do well. 1 to 2 weeks
  2. 2 Layout and samples Plans, lighting and a board of real finishes you can hold. 3 to 5 weeks
  3. 3 Joinery and furniture Every piece drawn, priced and matched to a maker. 4 to 6 weeks
  4. 4 Making Workshops build while we visit and check each piece. 6 to 14 weeks
  5. 5 Installation One week on site: furniture placed, lamps aimed, books shelved. 1 week
Black and white photograph of a building
Plate 3Yaba Printworks before the work began. Ninety-two per cent of its trusses were kept.

03Restoration

Keeping a building and making it better is usually cheaper, faster and less wasteful than starting again. We survey what is there, keep what is sound and repair what is not, from 1950s houses to industrial sheds, often adding a new room or pavilion alongside.

Typical projects

  • Houses from the 1950s to the 1990s
  • Industrial buildings turned into workplaces
  • Guest houses made from family homes

What you receive

  • Measured survey and condition report
  • Options to keep, adapt or replace, with costs
  • Design, permits and any heritage consents
  • Close site supervision, because old buildings surprise

See it in practice: Old GRA House, Old GRA, Port Harcourt

How restoration runs

  1. 1 Measured survey Every room measured, every crack and stain recorded and photographed. 2 to 4 weeks
  2. 2 Condition report What to keep, what to repair and what to replace, with reasons and costs. 2 to 3 weeks
  3. 3 Opening up Small, careful trial openings to confirm what lies behind the finishes. 1 to 3 weeks
  4. 4 Design and consents Repairs and any new work drawn together, approvals secured. 8 to 14 weeks
  5. 5 Repair on site Weekly visits, because the building will always have one more surprise. The length of the works
Model of a group of buildings
Plate 4A site model for a group of twenty-four homes on the edge of Abuja.

04Masterplanning

Layouts for groups of buildings on one site: small estates, school and clinic campuses, resorts and mixed developments up to around twenty hectares. We plan streets, shade, drainage and the spaces between buildings before any building is designed.

Typical projects

  • Small estates of 10 to 60 homes
  • School and clinic campuses
  • Resorts and lodges with several buildings

What you receive

  • Site analysis: sun, wind, water and ground
  • Layout options with plot sizes and phasing
  • A design code for every building type
  • A plan the planning authority can approve

How masterplanning runs

  1. 1 Site reading Levels, water courses, trees worth keeping and every way in. 3 to 5 weeks
  2. 2 Three layouts Plot sizes, streets and phasing compared side by side. 4 to 6 weeks
  3. 3 Preferred plan Streets, shade trees, drainage and open space fixed. 6 to 8 weeks
  4. 4 Design code Rules for heights, roofs, screens and materials, building by building. 4 to 6 weeks
  5. 5 Approval and phase one Plan approved, first buildings handed to architects, ours or others. 8 to 16 weeks

Fees are a percentage, paid stage by stage.

Each service has its own band, and the fee is divided across seven stages so you pay for each as it is finished. The process page explains the bands and the split.

How fees work