A year on the Katampe ridge

Notes from the site office on building eighteen villas into a granite slope without blasting it away.

By Zainab Abubakar, director, Abuja

A two storey villa with large windows and balconies

When we first walked the Katampe plot, the surveyors counted more than four hundred boulders larger than a car. The easiest thing would have been to blast them, level the hill and lay out a neat grid. We chose to do the opposite.

Surveying before drawing

We spent a full year on survey. Every boulder was mapped, every tree over 30 centimetres in girth was tagged, and the ridge was modelled at 25 centimetre contours. Only then did Oduya Arinze Studio begin placing villas, fitting each one into the gaps the rock allowed.

The result is an estate where no two plots are the same shape. Villa 9 has a boulder in its entrance court. Villa 21 wraps around one in a curve. Buyers often tell us those rocks were what made them choose their plot.

The hill was here long before us. Our job was to find the places where a house could sit without arguing with it.

Rain on a slope

Abuja's rains arrive fast and heavy. On a hillside, water is the real engineering problem. We built a network of stone-lined channels that follow the old run-off paths, and two attenuation ponds at the foot of the estate that now hold water through the dry season.

Where phase two stands

As of November, all eighteen phase two frames are complete and twelve villas are weathertight. Finishes have begun in the lower six, and the summit clubhouse is enclosed. We expect to hand over the first phase two villas in September 2027.

If you would like to see the ridge for yourself, we run site walks every Saturday morning. Wear flat shoes, and allow an hour.