Ikoyi waterfront, Lagos
The Aster
A slender tower set back from the lagoon edge, with every residence facing water and every living room taking the afternoon light from the west.
The building
The Aster stands on a 4,100 square metre plot on the Osborne foreshore, where Ikoyi meets the Lagos Lagoon. We kept the tower slim so that no residence looks into another, and gave the ground floor back to a landscaped lagoon walk that residents share with no one.
Fifty-four residences sit across eighteen floors. Every fourth floor gives up its residences to a planted sky garden, so the building breathes, and the penthouses on the top two floors each take a whole level.
- Residences
- 54
- Floors
- 18 plus two penthouse levels
- Plot
- 4,100 sqm, lagoon frontage
- Architect
- Oduya Arinze Studio
- Title
- Governor's Consent, Lagos State
- Completion
- Fourth quarter 2027
Photographs
-
The lagoon elevation, glazed floor to ceiling1 of 5 -
The podium pool, level four2 of 5 -
Three-bedroom living room, show residence 9B3 of 5 -
Principal bedroom with dressing wall4 of 5 -
Kitchen in rift-cut oak and honed travertine5 of 5
Residences
Sizes are internal floor areas, excluding terraces. Prices are for the lowest available floor and include parking.
-
Two-bedroom residence
Corner plan with a 14 sqm lagoon terrace
- Bedrooms
- 2
- Bathrooms
- 2
- Size
- 148 sqm
- From
- ₦685,000,000
-
Three-bedroom residence
Dual aspect, with a staff room and separate service entrance
- Bedrooms
- 3
- Bathrooms
- 3
- Size
- 212 sqm
- From
- ₦940,000,000
-
Four-bedroom garden duplex
Opens onto a sky garden, two floors linked by a stone stair
- Bedrooms
- 4
- Bathrooms
- 5
- Size
- 318 sqm
- From
- ₦1,480,000,000
-
Lagoon penthouse
A full floor with a private lift lobby and plunge pool
- Bedrooms
- 5
- Bathrooms
- 6
- Size
- 540 sqm
- From
- ₦3,200,000,000
Specification
The full schedule forms part of your contract. Any substitute must be equal or better, and agreed with you in writing.
Structure and facade
- Reinforced concrete frame designed for a 100-year life
- Double-glazed, solar-control curtain wall with slim bronze-anodised mullions
- Curved concrete balconies with frameless glass balustrades
- Piled foundations into the lagoon sands, independently checked
Interiors
- Honed Turkish travertine in living areas and halls
- Engineered oak floors in bedrooms
- 3.1 metre ceiling height throughout
- Solid Iroko internal doors with bronze ironmongery
Kitchens
- Rift-cut oak joinery with a travertine island
- Integrated appliances from a European maker, with a full-height wine cabinet
- Separate scullery and laundry in three bedrooms and above
Bathrooms
- Book-matched marble vanity walls
- Walk-in showers with linear drains
- Freestanding stone bath in principal suites
- Heated towel rails and anti-mist mirrors
Services
- Variable refrigerant air conditioning with individual room control
- Three 1,250 kVA generators with automatic changeover
- Central water treatment and 72-hour storage
- Fibre to every residence with two providers
Security and arrival
- Gated lagoon frontage with a manned gatehouse
- Two parking bays per residence, three for penthouses
- Private jetty with two berths for residents
- Concierge desk staffed day and night
Location
Osborne Road runs along the eastern edge of Ikoyi, close to Falomo and the Lekki link bridge, yet quiet once you turn off it.
Osborne Road foreshore, Ikoyi, Lagos
Typical drive times outside rush hour
- Falomo roundabout
- 6 minutes
- Victoria Island business district
- 12 minutes
- Lekki-Ikoyi Link Bridge
- 5 minutes
- Murtala Muhammed International Airport
- 45 minutes
- Ikoyi Club
- 8 minutes
- Schools on Bourdillon Road
- 7 minutes
Construction progress
Updated on the first Monday of each month after our site walk. Owners receive a filmed update of their own floor or plot.
-
March 2025, complete
Ground broken
Site cleared, hoarding raised and the lagoon walk protected.
-
August 2025, complete
Piling complete
212 bored piles cast and load-tested.
-
January 2026, complete
Podium and basement
Two basement levels and the four-storey podium topped out.
-
November 2026, in progress
Tower frame to level 11
One floor every 18 days. Curtain wall fitting has begun from level 2.
-
June 2027
Topping out
Frame complete, penthouse levels enclosed.
-
December 2027
Handover
Snagging walk with each owner, then keys.
Payment plan
30% to secure, the balance over up to 24 months, interest free during construction.
- Reservation fee of ₦10,000,000, credited to your deposit
- Monthly or quarterly instalments
- Price held from contract to handover
- 5% reduction for full payment within 30 days