Katampe hillside, Abuja
Katampe Ridge
A gated hillside of thirty-two villas, built around the rock rather than through it, twelve minutes from Maitama.
The building
Katampe Ridge sits on a granite shoulder north of Maitama. We spent a year surveying the slope before drawing a single villa, and kept every large boulder on the site where it was. The roads follow the contours, and the villas step down the hill so each one looks over the roof of the next.
Phase one, fourteen villas, was completed in 2025. Phase two adds eighteen villas higher up the ridge, including six crest villas on the summit plots.
- Villas
- 32 in two phases
- Estate
- 9.4 hectares, gated
- Plots
- From 900 to 1,600 sqm
- Architect
- Oduya Arinze Studio
- Title
- Certificate of Occupancy, FCT
- Phase one
- Complete, five villas remain
Photographs
-
Ridge villa 7 at dusk1 of 5 -
Every villa has its own pool, 12 metres long2 of 5 -
The lower lawn of a crest villa3 of 5 -
Garden room, phase one show villa4 of 5 -
Arrival court with covered parking5 of 5
Residences
Sizes are internal floor areas, excluding terraces. Prices are for the lowest available floor and include parking.
-
Four-bedroom garden villa
Single level living with a sunken garden room
- Bedrooms
- 4
- Bathrooms
- 5
- Size
- 420 sqm
- From
- ₦780,000,000
-
Five-bedroom ridge villa
Two storeys with a guest wing and staff quarters
- Bedrooms
- 5
- Bathrooms
- 6
- Size
- 560 sqm
- From
- ₦1,150,000,000
-
Six-bedroom crest villa
Summit plots only, with a cinema room and a 16 metre pool
- Bedrooms
- 6
- Bathrooms
- 7
- Size
- 780 sqm
- From
- ₦1,850,000,000
Specification
The full schedule forms part of your contract. Any substitute must be equal or better, and agreed with you in writing.
Structure and landscape
- Reinforced concrete frame on rock anchors
- Retaining walls faced in stone quarried on site
- Native planting with drip irrigation
- Each plot surveyed to keep its existing boulders
Interiors
- Honed travertine floors on the ground level
- Iroko staircase with a bronze handrail
- Ceilings of 3.4 metres in reception rooms
- Pocket doors opening the living room to the terrace
Kitchens
- Show kitchen with stone island and a separate working kitchen
- Integrated appliances with a double oven and warming drawer
- Walk-in pantry and cold store
Bathrooms
- Stone vanities and walk-in showers
- Garden showers off principal suites
- Water-saving fittings throughout
Services
- Estate substation with two independent feeders
- Solar array with battery storage on every villa
- Borehole and treatment plant for the estate
- Ducted cooling with zone control
Security and estate
- Single gated entrance with vehicle barrier and guardhouse
- Perimeter fence with camera coverage
- Clubhouse, gym and walking trail on the ridge
- Estate management office on site
Location
Katampe Extension lies just north of Maitama, with the hills behind it and the city spread out below.
Katampe Extension, Abuja, Federal Capital Territory
Typical drive times outside rush hour
- Maitama district
- 12 minutes
- Central Business District
- 18 minutes
- Nnamdi Azikiwe International Airport
- 40 minutes
- Jabi Lake
- 15 minutes
- International schools in Maitama and Wuse II
- 15 minutes
- National Hospital
- 20 minutes
Construction progress
Updated on the first Monday of each month after our site walk. Owners receive a filmed update of their own floor or plot.
-
February 2023, complete
Survey and estate roads
Contour roads, drainage and the estate wall.
-
October 2025, complete
Phase one handed over
Fourteen villas, nine now occupied.
-
April 2026, complete
Phase two structures
All eighteen villa frames complete.
-
November 2026, in progress
Roofs and glazing
Twelve villas weathertight, finishes begun in the lower six.
-
May 2027
Clubhouse opens
Gym, lounge and the summit walking trail.
-
September 2027
Phase two handover
Landscape planted a season ahead of keys.
Payment plan
Phase two: 25% to secure, then up to 30 months. Phase one villas: 50% on contract, balance within six months.
- Reservation fee of ₦15,000,000, credited to your deposit
- Instalments up to 24 months are interest free
- Longer plans carry a flat 7.5% on the balance
- Plot choice is held for 14 days after reservation