← A Covorn template · Charity and foundation website Make it mine

The borehole at Kumo

Before the water point, Amina's school day began with a jerrycan and a two-kilometre walk. Now it begins with assembly.

Children standing beside a hand water pump
Illustrative photograph. It does not show Amina.

Every school morning in the dry season, Amina and the other girls in her class carried jerrycans to a stream two kilometres from the school, filled them, and carried them back for the school's drinking pots and toilets. Boys swept the compound. By the time the girls returned, the first lesson was half over.

In 2023 our engineer, Ibrahim Sani, surveyed the compound with the school-based management committee. A solar borehole was drilled by a contractor from Akko, with four girls' toilets, a washroom and two handwashing stations.

“I write the pump number in the book every Monday. If it changes, I tell Malam Sule the same day.”

Amina was one of two student prefects chosen for the new water committee. She keeps the logbook: pump readings every Monday, any faults reported to Malam Sule, the committee secretary. In two years the pump has been repaired once, in four days, from the maintenance fund.

She is now in JSS3 and has not missed a first lesson this year. “Assembly, then mathematics,” she says. “That is the order now.”

Where Amina is now

In JSS3 and water committee prefect. The pump logbook has 96 entries.

Updated June 2026.

Amina's story started with clean water at school.

₦6,800,000 builds a solar water point, toilets and a handwashing station.

Give to clean water at school How the programme works